Suppliers
Supplier Quality Requirements
We make composite parts and tools for wind, aerospace, marine and industrial customers, and every part we ship comes with a record of the materials that went into it. That only works if what our suppliers send us is right, traceable and backed up with the correct paperwork. This page sets out what we expect from anyone supplying us with materials, parts or services that affect the quality of our work.
These requirements apply to every purchase order unless the order says otherwise. Where a customer’s own requirements apply to a job, we will pass them on to you on the purchase order and they come first.
Quality system
- We prefer suppliers with a certified quality management system such as ISO 9001. Please send us a copy of your certificate and tell us if it lapses or the scope changes.
- New suppliers are asked to fill in our supplier questionnaire before their first order. We review supplier performance at least once a year.
With every delivery
- A certificate of conformity (CoC) confirming the goods meet the purchase order and specification.
- Batch or lot numbers on the goods and the paperwork, so we can trace every material into the parts we make.
- Manufacture and expiry dates for resins, adhesives, prepregs and anything else with a shelf life, with enough life left for us to use it.
- A current safety data sheet (SDS) for any hazardous material.
- Goods that are packed to arrive undamaged, clearly labelled with our purchase order number.
Deliveries are checked at goods-in against the purchase order and the paperwork. Anything that does not match will be held or sent back.
Changes
Do not change a material, formulation, process, manufacturing site or sub-supplier on anything you supply to us without telling us first and getting our agreement in writing.
Non-conformances
- If you find a problem with something you have already sent us, tell us straight away.
- If we raise a non-conformance report (NCR) against a delivery, we expect a response within 2 working days and corrective action closed within 30 days.
Outsourced processes
Where we subcontract a process, such as machining or testing, it is controlled in the same way as our own work. We, our customers and, where needed, regulatory bodies may ask to visit and audit the work.
Records
Keep quality records for anything you supply to us, including test results and certificates, for at least 5 years and make them available to us if we ask.
How we measure suppliers
- On-time delivery: 95% or better against the date on the purchase order.
- Quality: no more than 1% of deliveries non-conforming.
- Paperwork: 100% of deliveries with the correct CoC and documents.
Responsible sourcing
We expect suppliers to follow the law, including health and safety, environmental and employment law, to meet REACH and RoHS where they apply, and to work to the standards in our Code of Conduct.
Questions about these requirements? Email admin@huntercomposites.co.uk or call 01983 200471.
