Production Runs

We make parts in volume as well as one at a time. We have supplied well over a hundred thousand parts into wind energy, and we run repeat work for other customers alongside it.

Production work is run to a fixed method with its own paperwork, so part number five thousand is made the same way as part number one.

What it suits

  • Ongoing supply and scheduled call offs
  • A fixed method and full paperwork
  • ISO 9001 and ISO 14001 certified
  • JOSCAR and Cyber Essentials

Get in touch with us

Have A Project?

ISO 9001:2015 certified quality management system  |  ISO 14001:2015 certified environmental management system

Certificates 25/0819 and 25/0820, issued by Centre for Assessment Ltd